Overview
The process from TIM1 (Paste, Film, Metal) to Lid attach and Snap-curing can be performed automatically.
Appearance and dimension inspection modules can be added into each process.
Taiwan’s HTA (Horng Terng Automation Co., Ltd.) has strong track record in the global market
Advantages
- Integrated process that automates TIM1 + Lid attach + Snap-curing
- High-precision heat, pressure and position accuracy control, MES linkage with SECS/GEM
- Advantageous for large packages such as AI/HPC
- Maintaining packaging quality and uniformity in mass production, reducing management costs
DS3070 series
| Module | Model number | Process |
|---|---|---|
| Loader | LD5320 | Carrier boat loading → PCB positioning |
| Dispensing | DP5000 | Lid adhesive paste, TIM paste dispensing |
| Lid Attaching | PH5000 | Lid pick-up → align → attach |
| Snap-curing | HP5600 | Crimping and holding → Curing |
| Unloader | LD5030 | Carrier boat discharge and storage |
| Film TIM (optional) | PH5010 | Pick-up film TIM → align → attach |
| Dispense inspection (optional) | LC3320 | Paste and TIM dispensing quality inspection (AOI) |
| Lid attach inspection (optional) | LC3330 | Lid quality inspection (AOI) |
| Hot clamp inspection (optional) | TA1000+LI3000 | Lid inspection after pre-curing, Snap-curing |
